Brisbane Melbourne Hobart Launceston Devonport
Experience example
"Boldly go where no one has gone before" - Captain James T. Kirk
Industry
Maritime
Sector
Logistics
Segment
Propulsion Systems
The aim was to upgrade the existing Stern Thrusters Digital DC Converters in a cost effective, compliant way minimising operational impact, this was achieved by:
Firstly operability was improved; one button now started the
drives, reliable indication of drive speed was provided, additional emergency stops and fault indication were fitted to the bridge, harmonic distortion and voltage spikes were reduced on the electrical system and low speed feedback encoders fitted, allowing parameter editing and
monitoring of operational variables. Intelligent design reduced manual handling requirements when changing major components and installing contemporary electrical components meant spares were now readily available. Future changes could also be easily made via a local HMI or laptop.