Experience example
"Simple can be harder than complex; you have to work hard to get your thinking clean to make it simpleā - Steve Jobs
Industry
Energy
Sector
Wind
Segment
System Engineering
The project was highly complex, multiple stakeholder systems need to be transitioned while maintaining production and maintaining interaction with the Australian Energy Market Operator (AEMO). This involved a high level of technical competency. Main works included:
From commencement to completion the transfer took 9 months and was seamlessly delivered in line with the commercial transition of the asset without any loss of production. The system audit ensured that the communications systems were fully documented aiding ongoing support and the AEMO 8Legs semi-dispatch system was successfully implemented greatly reduced non-conformances.